TH2ECO

Country
Germany

Since 2021, we have been driving the expansion of a sustainable hydrogen infrastructure. As soon as the necessary infrastructure is firmly established, we plan to use green hydrogen produced from locally generated renewable electricity. The hydrogen will be transported via a H2 pipeline. For this, we are utilizing an existing gas pipeline. We are also integrating a hydrogen storage system, ensuring that hydrogen will be available even during seasonal fluctuations.

Lead developer Ferngas Netzgesellschaft mbH
Project partner

Overarching / General

Ferngas

H2 production

BOREAS, greenwind

H2 transportation, storage & distribution

Ferngas, SWE Netz, TEP

H2 end use

H2NOW, SWE Energie

Locations
Germany | Erfurt

Project details

Production volume

H2 production from electrolysis

3,000 H2 tons/year

Final products

3000.00 tons/year of H2

H2 color

Green

Total electrolyser capacity

0.00 MW

Value chain coverage

Primary energy sourcing

Onshore wind Photovoltaics Grid Dedicated onsite renewables

H2 production

Polymer electrolyte membrane (PEM) electrolyser

H2 Storage

Natural/geological - 4500.00 tons

H2 transport

Pipeline Trucking

End use

Mobility

Road

Energy

Hydrogen supply to gas-fired power plants

Industry

Other

Project timeline

Planned timeline for First built out stage

Q3 2021 Project initiated
Q4 2022 Concept study completed
Q2 2023 Feasibility study completed