Asturias H2 Valley

Country
Spain

The project includes a renewable hydrogen electrolysis plant with a capacity of 150 MW, located on the land of the Aboño Thermal Power Plant. In addition, a possible scalability of the project up to 500 MW in Aboño site and 500 MW in Soto de Ribera is being studied, pending definition depending on market conditions and development.

Lead developer EDP
Project partner

Overarching / General

The project is supported through different funding mechanisms by the European Commission and the Spanish Government

H2 production

EDP

Locations
Spain | Aboño

Project details

Production volume

H2 production from electrolysis

18,000 H2 tons/year

Final products

18000.00 tons/year of H2

H2 color

Green

Total electrolyser capacity

150.00 MW

Total investment (CAPEX)

300 EUR m

Value chain coverage

Primary energy sourcing

Grid

H2 production

Alkaline water (ALK) electrolyser – 150.00 MW

End use

Mobility

Road

Industry

Other

Project timeline

Current status: FEED completed

Planned timeline for First built out stage

Q1 2024 Project initiated
Q1 2024 Concept study completed
Q1 2024 Feasibility study completed
Q2 2027 FEED completed
Q2 2027 Final Investment Decision taken
Q3 2027 Construction started
Q2 2029 In operations